← Steel detailing & fabrication drawings
Mezzanine floor drawings
Fabrication and Building-Control drawings for steel mezzanine floors - columns, beams, decking layout and connections - detailed from your engineer's design.
What the drawing set includes
- Column grid and beam GA
- Beam & column fabrication drawings
- Base plates, cleats and connection details
- Decking and edge-protection layout
- Staircase interface
- Marking plans + cutting lists
How it works
- Send the engineer's design / loadings and the floor area
- GA for approval
- Fabrication drawings + connections
- Revisions to fabrication-ready
Building Regs
A mezzanine is usually a Building Regs matter (structure, fire, means of escape). The engineer sizes it; I produce the fabrication and Building-Control drawings.
Questions
Do you do the fire/escape design?
No - that's the engineer/BC route; I detail the steelwork.